NSC-Logo-Graphics

 Live chat by LivePerson
 

OPERATIONS -- Power & Heat Switch

PowerSwtch01

Shown to the left is the Control Box.  Before we start, make sure the Power Switch is in the down or OFF position.  When the Power Switch is in the OFF position the Power Indicating Lamp (2) is not illuminated.

HeatOn

Also make sure that the Heat On switch is in the left (1) or OFF position.

The Heat On Indicating Lamp (3) is only illuminated when the heating cycle timers are automatically activated.

NEXT

All Rights Reserved, (c) 1994-2013

Novaseal Corporation      Tel: 561-470-3267