Upgraded ShadeSealer-168 was shipped to DQL on November 22, 2010.
After removing the front center panel, and pursuant to your request to add upper sealing bar support, we added a channel to both alignment rods. These support channels (2) are comprised of aluminum channel covered by bubble wrap and secured with duct tape. Simply cut or remove the duct tape, then the aluminum to free the machine of these additional supports.
Additionally, we further secured the rubber pad located at the right rear of the machine with rubber adhesive.
Forklifts can not be used to load fully crated machine into a trailer. Best and most economical means is to use a towing service with adjustable bed.
Towing truck winch system used to pull crated machine onto the truck bed.
Once secured on the towing truck, the truck is backed up to mate with trailer.
Although the Livingston trailer was 90 minutes late, the trailer was empty. License tag on the Livingston trailer was Quebec RV76090.
Transferring crated machine from towing truck to Livingston trailer.
Crate secured by the Livingston driver at the front of the trailer truck as his first pickup.